No Products in the Cart
NOTE: We are now providing two shipping options, the sea and air shipping. These countries will have to choose air shipping only: USA (HI,Alaska,Puerto Rico),Australia,Canada, Japan, New Zealand, Norway, Switzerland, United Arab Emirates.
It usually takes about 50-60 days for delivery if you choose shipping by sea or train.
Note: Due to the impact of the Covid-19 epidemic, customs clearance may be delayed
Black hawk 2 upgrade details:
The Black Hawk is like a hunter flying high into the sky, you can do whatever you want.
Vesta black hawk series uses adjustable motor mount, Our board can be easily fit to different diameters and different types wheels;
Wheel diameter adaptation: 83mm-170mm;
The black hawk is upgraded with a replaceable flexible waterproof battery, with more stable performance and better maintainability.
Gravity Casting vs. Die Casting for Aluminum Skateboard Truck Parts
Comparison | Gravity Casting | Die Casting |
Cast Alloy | A356-T6 aluminum alloy | A380 aluminum alloy |
Process | Liquid aluminum alloys flows into to mold under gravity | Liquid aluminum alloy is pressed into mold under high pressure. |
Heat Treatment | Can do T6 heat treatment to improve the strength | Can not do heat treatment. |
Strength | Stronger with higher Hardness | Weaker with lower hardness |
Cost | Complex process and high cost | Good unit price but high tooling cost |
Bearing Weight | Can bear 150kgs or more. | Can bear 95kgs at most. |
Vestar Black Hawk series is equipped with 6368*2 dual belt motor,
The sufficient power output of 2000W*2 allows the skateboard to have a strong acceleration ability. The acceleration of 0-20 miles is within 4 seconds, and the climbing ability reaches an incredible 35% or more!
Note: However, We should avoid water intake at power button and charging port.
Model |
Airless tire |
Air tire |
|
SPEC |
Max speed |
27 Miles/H |
27 Miles/H |
Max range |
35 Miles |
35 Miles |
|
Max load |
150 kg / 330 lbs |
150 kg / 330 lbs |
|
Hills |
UP TO 35% |
UP TO 35% |
|
MOTOR |
Type |
Belt Drive |
Belt Drive |
Power |
6368 2000W*2 |
6368 2000W*2 |
|
BATTERY |
Wh |
630Wh |
630Wh |
WHEELS |
Material |
Rubber |
Rubber |
Size |
6.5inch/165 mm |
7inch/170 mm |
|
Hardness |
70A |
70A |
|
DECK |
Material |
Bamboo + Maple |
Bamboo + Maple |
Length |
38 inches / 97 cm |
38 inches / 97 cm |
|
CASE |
CASE Material |
ABS |
ABS |
TRUCKS |
Trucks |
9.25inch Aluminum T6 |
9.25inch Aluminum T6 |
Busing |
Double Kingpin 97AA |
Double Kingpin 97AA |
|
Bearing |
NSK Precision Bearing |
NSK Precision Bearing |
|
OTHERS |
USB port |
2 |
2 |
|
|
|
|
IN BOX |
Remote |
R3 OLED Remote |
R3 OLED Remote |
Manual |
1 |
1 |
|
Quick Charger |
3A |
3A |
|
AC Power Cable |
1 |
1 |
|
Type-C Cable |
1 |
1 |
|
Skate Tool |
1 |
1 |
|
Spline End Wrenches |
1 |
1 |
|
COMPLATE |
Net weight |
26 lbs |
30 lbs |
Gross weight |
|
|
|
Package Size |
|
Shipped by sea or train: US / Arrives 50-60 Days;Europe, Canada / Arrives 50-60 Days.
We are now providing two shipping options, the sea and air shipping. These countries will have to choose air shipping only: USA (HI,Alaska,Puerto Rico),Australia,Canada, Japan, New Zealand, Norway, Switzerland, United Arab Emirates.
Continent | Countries | Warehouse | Time |
---|---|---|---|
North America | United States | China | 7-10 Business days |
North America | Canada | China | 15-20 Business days |
Europe | Germany, Austria, Belgium, Bulgaria, Croatia, Denmark, Estonia, Finland, France, Greece, Hungary, Ireland, Italy, Latvia, Lithuania, Luxembourg, Netherlands, Norway, Poland, Portugal, Romania, Czech Republic, Russian Federation, Ukraine, Slovakia, Slovenia, Spain, Sweden, Switzerland, United Kingdom, Iceland | China | 15 to 20 Business days |
Asia | Japan, Republic of Korea, Taiwan China, Viet Nam, Bangladesh, Myanmar, Lao People's Democratic Republic, Malaysia, Singapore, Thailand, United Arab Emirates, Bahrain, Kazakhstan | China | 3 to 6 Business days |
Australia | Australia, New Zealand | China | 15 to 20 Business days |
Note: Due to the impact of the Covid-19 epidemic, customs clearance may be delayed
Update on 11/12/2021